A few weeks ago I had three wips going at once. I was working on the turkey, a kidster hat, and the big cable bag. I have to say it was a little strange. Me, your ever faithful monogamous knitter was cheating again. At first, I said to myself, "so this is what all the other knitters are like". Then it dawned on me that having multiple projects was not for me.
One reason was that I was trying to knit at times I don't normally knit. It was getting in the way of keeping up with the other non-knitting things that needed to get done around here. I guess having more projects going made me feel pressured to get something, anything finished. The other reason that struck me is that I spend the whole day multitasking between kidsters, school schedules, and basically keeping everyone (ok, mostly me) sane. It wasn't working for me to try to multitask in my knitting. It was stressing me out! Now I am thankfully back to one project. I hope to keep it that way for a while since I could use a little relaxation. I'm off now to go sit and knit on my one project for a while.
Showing posts with label monogamous knitting. Show all posts
Showing posts with label monogamous knitting. Show all posts
Tuesday, December 1, 2009
Monday, May 25, 2009
Two new projects
Right now you are looking around befuddled. It looks like the same blog. Yup, picket fence, green grass, but how could that be? Did she just say "two new projects"?
Yes, your ever faithful monogamous knitter is doing a little two timing. On purpose.
See, the last time I went to ladies night, I brought my sage cabled purse to show off. Well, my two girlfriends just loved it and wanted their own. And they weren't just doing me lip service either, since Pat practically pulled out money right there and then. Plus, she had already said that she wanted a summer color bag. The other one I had made for her was her winter bag. So, I am adjusting the pattern ever so slightly, and trying to work on them "at the same time". I can't really show up to our next gathering with one done and the other one not, can I?
The blue one is much further along and the sit-down-at-night-keeping-track-of-your-cable-row project. (Yes, that's the cable needle necklace I won. More on that next post, I promise!)
The tan one is the outside-in-the-backyard-while-kidsters-play project. It tends to get put down a lot. I'm lucky if I can finish a row before I am needed to attend to bug catching, swing pushing, hole digging, or other boyish adventure. So it may end up that one gets done before the other one anyway.
I haven't told the blue one about the tan one, or vice versa. I wouldn't want either one of them to feel slighted. Wish me luck!
Yes, your ever faithful monogamous knitter is doing a little two timing. On purpose.
See, the last time I went to ladies night, I brought my sage cabled purse to show off. Well, my two girlfriends just loved it and wanted their own. And they weren't just doing me lip service either, since Pat practically pulled out money right there and then. Plus, she had already said that she wanted a summer color bag. The other one I had made for her was her winter bag. So, I am adjusting the pattern ever so slightly, and trying to work on them "at the same time". I can't really show up to our next gathering with one done and the other one not, can I?
The blue one is much further along and the sit-down-at-night-keeping-track-of-your-cable-row project. (Yes, that's the cable needle necklace I won. More on that next post, I promise!)
The tan one is the outside-in-the-backyard-while-kidsters-play project. It tends to get put down a lot. I'm lucky if I can finish a row before I am needed to attend to bug catching, swing pushing, hole digging, or other boyish adventure. So it may end up that one gets done before the other one anyway.
I haven't told the blue one about the tan one, or vice versa. I wouldn't want either one of them to feel slighted. Wish me luck!
Sunday, January 18, 2009
Yarn freeze
It's kind of like a brain freeze of yarn. I can't decide what to cast on next. Oh sure I have a lot of things in my queue. And plenty of yarn to do them with (like that even needs to be said). But I want to get back to knitting purses. Ok, so do it, right? Well, I've managed to make some cold weather gear for both kidsters and myself (all on my ravelry projects page). Hubster got a new coat and hasn't benefited from any coordinated knitting yet. Hmmm...
Ok, here's the real issue...
I'm a monogamous knitter. Is that even possible? Most people I hear from have three, four, even a dozen or more projects going at once. Not me. When you only get about an hour, two if I'm really having a lucky day, then you want to make it count right?
Ok, here's the real issue...
I'm a monogamous knitter. Is that even possible? Most people I hear from have three, four, even a dozen or more projects going at once. Not me. When you only get about an hour, two if I'm really having a lucky day, then you want to make it count right?
Subscribe to:
Posts (Atom)